Installation Drawings
Vertiv
Large System, 3-Phase UPS Battery System Installation Manual
48
Figure 46
Terminal details, Liebert NXL
™
625/750kVA UPS to top-terminal battery and stand-alone junction cabinet,
point-to-point wiring
Table 14
Terminal details, Liebert NXL 625/750kVA UPS to top-terminal battery and stand-alone junction cabinet,
point-to-point interconnect wiring
Run
From
To
Conductors
A
Battery Cabinet Negative Bus
Junction Negative Bus
Negative DC Power
B
Battery Cabinet Positive Bus
Junction Positive Bus
Positive DC Power
C
Battery Cabinet Ground
Junction Ground
Ground
D
Junction Positive Bus
UPS Cabinet Positive Bus
Positive DC Power
E
Junction Negative Bus
UPS Cabinet Negative Bus
Negative DC Power
F
Junction Ground
UPS Cabinet Ground
Ground
G
Battery Cabinet Battery Interface Board (BIB)
UPS External Interface Board (EIB)
CAN Control Cables
STAND-ALONE
JUNCTION CABINET
BATTERY CABINET
TOP VIEW
B
A
F
C
E
A
D
B
A
B
C
DC (-)
Input
DC (+)
Input
Ground
Bus
DC Input
UPS LEFT SIDE
Rectifier (Part A)
UPS LEFT
Front (Part A)
G
G
D
F
E
C
Summary of Contents for Liebert NXL 1100
Page 2: ...Liebert Large System 3 Phase UPS Battery System Installation Manual...
Page 69: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 62 NOTES...
Page 70: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 63...
Page 71: ...Specifications Vertiv Large System 3 Phase UPS Battery System Installation Manual 64...