TABLE OF CONTENTS
1 Important Safety Instructions
3 Pre-installation Preparation and Guidelines
3.3 Implementing a Hot Aisle/Cold Aisle Equipment Layout
4 Equipment Inspection and Handling
4.1 Storing Before Installation
4.3 Handling the Unit while Packaged
4.4 Unpacking the Export Shipped Unit
4.5 Unpacking the Domestic Shipped Unit
4.6 Removing Units from the Pallet
5.1 Adjusting Base Supports/Leveling Feet
6.1 Fluid Volume for Unit and Connection Piping
6.2 Water Quality Requirements
6.3 Connecting the Closed Loop System
6.4 Leak Check before Commission and Operation
6.5.2 Flushing the Cooling System
6.5.3 Filling the Complete System
7.1 Power Supply Cable Connection Guidelines
7.2 Wiring Connection Guidelines
7.3 Electrical Field Connections
7.4 Protective Features of the Electronically Commutated (EC) Fans—All Models
8.1 Checks to Perform after Startup
i
Summary of Contents for Liebert XDU 060
Page 1: ...Liebert XDU Liquid to Air Heat Exchanger for Chip Cooling Installer User Guide 600 mm Wide ...
Page 10: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling 6 This page intentionally left blank ...
Page 38: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling 34 ...
Page 74: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling ...