TABLE OF CONTENTS
1 Important Safety Instructions
2.3 Environmental Considerations
2.3.2 Storing the UPS and Batteries for Delayed Installation
2.4.3 Raised-Floor Installations
2.6 Installing a Junction Cabinet
3.1 Grounding Configuration for Battery Systems
3.2 Connecting Equipment Ground Cables and Straps
3.3 Interconnecting Battery Cables in a Top-Terminal Cabinet
3.4 Interconnecting Battery Cables in a Front-terminal Cabinet
3.6.1 Connecting to Liebert EXL S1
3.6.2 Connecting to Liebert EXL
3.6.3 Connecting to Liebert NX
3.6.4 Connecting to Liebert NXL
3.6.5 Connecting a Vertiv™ Battery Monitoring System
3.6.6 Connecting an External Room Temperature Sensor
i
Summary of Contents for Liebert
Page 1: ...Liebert Large UPS Battery System Installer User Guide ...
Page 4: ...Vertiv Liebert Large UPS Battery System Installer Guide ii This page intentionally left blank ...
Page 6: ...Vertiv Liebert Large UPS Battery System Installer Guide 2 This page intentionally left blank ...
Page 14: ...Vertiv Liebert Large UPS Battery System Installer Guide 10 This page intentionally left blank ...
Page 39: ...Vertiv Liebert Large UPS Battery System Installer Guide ...