Vertiv™ NetSure™ 2100 Series -48 VDC Power System User Manual
Proprietary and Confidential © 2022 Vertiv Group Corp.
4
4
Maintenance
4.1
System Maintenance Procedures
It is recommended to perform the maintenance procedures listed in Table 4.1 every 6 months to ensure continual system operation.
Table 4.1
Maintenance Procedures to be Performed at 6-Month Intervals
Procedure
Referenced In
Check ventilation openings for obstructions such as dust, papers, manuals, etc.
--
Inspect and tighten all installer's connections.
IM582138000
4.2
Adding a Rectifier
To increase system current capacity, a rectifier module can easily be added if an empty rectifier module mounting position is available.
Refer to rectifier instructions UM1R481000e3 for a rectifier installation procedure.
4.3
Field Installing Compact Type Load Distribution Circuit Breakers in a List
BA and List BB Distribution Unit
Refer to "Installing Compact Type Load Distribution Circuit Breakers (List BA, BB)" in the Installation Manual (IM582138000).