Vertiv
|
NetSure -48V DC Bulk Output Power System Installation and User Instructions (UM582127100)
|
Rev. E
13
Installing the Rectifier Modules and Initially Starting the System
Rectifier Modules Installed
System Started, Configured, and Checked
INSTALLING THE SYSTEM
General Requirements
•
This product is intended only for installation in a restricted access location on or above a non-
combustible surface.
•
This product must be located in a controlled environment with access to crafts persons only.
•
This product is intended for installation in network telecommunication facilities (CO, vault, hut, or other
environmentally controlled electronic equipment enclosure).
•
This product is intended for connection to the common bonding network in a network
telecommunication facility (CO, vault, hut, or other environmentally controlled electronic equipment
enclosure).
•
The DC return connection to this system can remain isolated from system frame and chassis (DC-I).
•
This system is suitable for installation as part of the Common Bonding Network (CBN).
•
The installer should be familiar with the installation requirements and techniques to be used in securing
the relay rack to the floor.
•
Rectifier and rectifier module mounting shelf ventilating openings must not be blocked and temperature
of air entering rectifiers must not exceed rated operating ambient temperature range found in
SAG582127100.
•
Clearance requirements are:
a)
Recommended minimum aisle space clearance for the front of each bay is 2' 6".
b)
Minimum spacing from the rear of the bay to a wall or other solid surface is that which is specified
for proper rectifier module mounting shelf ventilation. Refer to the rectifier module mounting shelf
Power Data Sheet for ventilation spacing requirements.
NOTE!
Minimum rear spacing specified for ventilation may not permit installation and
maintenance of the system.
Recommended minimum aisle space clearance for the rear of each bay is 2’ 0” to allow for
installation and maintenance.