27
3.6
Rear Brake
Component
Qty
Torque [lbs
·
ft (
N·m
)]
Pipe-oil tube connection
1
13.7–18.4
(
20–25
)
Caliper–oil tube connection
2
13.7–18.4
(
20–25
)
Rear disk clamping screw (°)
6
8.1–9.6
(
11–13
)
Oil bleeder screw
1
8.8–11.8
(
12–16
)
Caliper–engine fixing screw
2
13.7–18.4
(
20–25
)
Brake pump basin screw
2
11.0–14.7
(
15–20
)
Caliper coupling screw
2
22.1–24.3
(
30–33
)
3.7
Silencer
Component
Qty
Torque [lbs
·
ft (
N·m
)]
Silencer heat shield fixing screw
4
3.7–4.4
(
5–6
)
Exhaust gas inlet screw
1
9.6–11.0
(
13–15
)
Silencer–support arm fixing screw
3
13.7–18.4
(
20–25
)
3.8
Hydraulic Components
Component
Qty
Torque [lbs
·
ft (
N·m
)]
Hub oil bleeder cap
1
11.0–12.5
(
15–17
)
Oil filter–crankcase fixing screw
1
19.9–24.3
(
27–33
)
Engine oil-net filter bleeder cap
1
17.7–22.1
(
24–30
)
Summary of Contents for GT 200
Page 1: ......
Page 90: ...90 9 1 2 Turn Signal Lights Horn Services and Accessory Pre Wiring ...
Page 151: ...151 10 10 Lubrication Circuit ...