- Disconnect the fan control relay and the control unit.
- Verify ground insulation of the cable between the fan control relay (PIN 85) and the control unit (PIN
24). Restore the cabling if necessary.
Open circuit:
- Carry out the check procedure of the control unit and relay connectors.
- Verify electrical continuity of the cable between the relay connector (PIN 85) and the control unit
connector (PIN 24).
- Verify electrical continuity of the cable between the relay connector (PIN 30) and the secondary fuse
holders.
- Verify continuity between relay PIN 85 and PIN 86. If there is no continuity replace the relay.
Vespa GTS Super 125 i.e.
Electrical system
ELE SYS - 113
Summary of Contents for GTS Super 125 i.e.
Page 1: ...SERVICE STATION MANUAL 677714 EN Vespa GTS Super 125 i e ...
Page 4: ......
Page 6: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Page 31: ...INDEX OF TOPICS TOOLING TOOL ...
Page 43: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Page 53: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL ...
Page 57: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Page 114: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Page 122: ...INDEX OF TOPICS INJECTION INJEC ...
Page 123: ...Vespa GTS Super 125 i e Injection INJEC 123 ...
Page 167: ...Vespa GTS Super 125 i e Injection INJEC 167 ...
Page 186: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Page 210: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Page 225: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS ...
Page 228: ...INDEX OF TOPICS CHASSIS CHAS ...
Page 240: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Page 244: ...INDEX OF TOPICS TIME TIME ...