- Get a + 2.5 l container to collect the coolant.
- Remove the coolant inlet pipe to the motor as
indicated in the photograph.
- Disconnect the fuel pipe from the injector and re-
move the screw locking the retainer clamp.
- Disconnect the injector wiring and the throttle
body control unit wiring.
- Disconnect the cable harnesses from the two
clamps indicated.
Vespa GTS Super 125 i.e.
Engine from vehicle
ENG VE - 117
Summary of Contents for GTS Super 125 i.e.
Page 1: ...SERVICE STATION MANUAL 677714 EN Vespa GTS Super 125 i e ...
Page 4: ......
Page 6: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Page 31: ...INDEX OF TOPICS TOOLING TOOL ...
Page 43: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Page 53: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL ...
Page 57: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Page 114: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Page 122: ...INDEX OF TOPICS INJECTION INJEC ...
Page 123: ...Vespa GTS Super 125 i e Injection INJEC 123 ...
Page 167: ...Vespa GTS Super 125 i e Injection INJEC 167 ...
Page 186: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Page 210: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Page 225: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS ...
Page 228: ...INDEX OF TOPICS CHASSIS CHAS ...
Page 240: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Page 244: ...INDEX OF TOPICS TIME TIME ...