Check the efficiency of the injection load relay.
Check the resistance of the energising coil be-
tween pins 86 and 85: 40 to 80 Ohm
Apply a voltage of 12V to pins 86 and 85; make
sure that there is continuity between pins 30 and
87 of the relay.
Check the power supply line of the injection load
relay energising coil: after switching to "ON", make
sure there is battery voltage, for 2 seconds, be-
tween the Red-White cable and Black-Purple ca-
ble of the relay base. If there is not, check the
continuity of the Red-White cable between the
fuse box and the relay base and of the Black-Pur-
ple cable between the pin 22 of the control unit and
the relay base.
N.B.
CONTINUITY TESTS MUST BE CARRIED OUT WITH THE
COMPONENTS DISCONNECTED. (RELAYS, CONTROL
UNIT, FUSES ETC.).
Vespa GTS Super 125 i.e.
Injection
INJEC - 171
Summary of Contents for GTS Super 125 i.e.
Page 1: ...SERVICE STATION MANUAL 677714 EN Vespa GTS Super 125 i e ...
Page 4: ......
Page 6: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Page 31: ...INDEX OF TOPICS TOOLING TOOL ...
Page 43: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Page 53: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL ...
Page 57: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Page 114: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Page 122: ...INDEX OF TOPICS INJECTION INJEC ...
Page 123: ...Vespa GTS Super 125 i e Injection INJEC 123 ...
Page 167: ...Vespa GTS Super 125 i e Injection INJEC 167 ...
Page 186: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Page 210: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Page 225: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS ...
Page 228: ...INDEX OF TOPICS CHASSIS CHAS ...
Page 240: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Page 244: ...INDEX OF TOPICS TIME TIME ...