Length of the swinging arm tube on the chas-
sis side:
283 ± 0.1 mm
- Lubricate roller casings and the plastic bushings
with grease
- Insert the spacers
- Assemble the two arms with the relative bolt in
the position shown in the picture
- Adjust the bolt as shown in the picture
- Position the chassis side swinging arm with the
most protruding part pointing towards the silent
block side as shown in the picture
Recommended products
AGIP GREASE PV2
Ivory smooth-textured,
slightly-stringy anhydrous calcium-base
grease.
TL 9150 066, NATO G 460 symbol
- Make sure the silent bloc is not broken. If it is,
replace the coupling.
- Remove the Seeger ring shown in the picture
- Remove the full silent bloc bracket
- Undo the silent bloc ring shown in the picture
Vespa GTS Super 125 i.e.
Suspensions
SUSP - 205
Summary of Contents for GTS Super 125 i.e.
Page 1: ...SERVICE STATION MANUAL 677714 EN Vespa GTS Super 125 i e ...
Page 4: ......
Page 6: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Page 31: ...INDEX OF TOPICS TOOLING TOOL ...
Page 43: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Page 53: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL ...
Page 57: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Page 114: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Page 122: ...INDEX OF TOPICS INJECTION INJEC ...
Page 123: ...Vespa GTS Super 125 i e Injection INJEC 123 ...
Page 167: ...Vespa GTS Super 125 i e Injection INJEC 167 ...
Page 186: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Page 210: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Page 225: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS ...
Page 228: ...INDEX OF TOPICS CHASSIS CHAS ...
Page 240: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Page 244: ...INDEX OF TOPICS TIME TIME ...