19
STEP 4: install ceiling bracket, mounting
anchors and screws
Place center of upper chimney bracket inline with centerline and
all the way up to ceiling then screw it to the wall.
Pre-drill holes where your mounting marks are, then insert wall
anchors and mounting screws, make sure leaving 1/6” space
away from the wall.
STEP 5: Hang the hood and connect
Carefully hang the hood body on the wall, attaching it to the 2
screws already in place.
Level the hood body by using horizontal level
Use hand screw driver to tight those 2 mounting screws
Connect the exhaust on the hood to the ductwork above.
Use aluminum tape to make all joints secure and all tight
Summary of Contents for Frankfurt VRH-WI05-30BS
Page 1: ...Frankfurt User Manual VRH WI05 30BS 36BS ...
Page 2: ......
Page 9: ...9 Height Clearance Min 24 Max 31 ...
Page 12: ...12 Venting Methods ...
Page 14: ...14 Tools Needed 1 6 ...
Page 16: ...16 Product Dimensions ...
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ...www vesta kitchen ...