370301.01
23
vetus®
Installation instructions and operation manual E-Line electric propulsion
ENGLISH
B
A
170 (6
11
/
16
”)
ø 28 (1
1
/
8
”)
max. 35 (1
3
/
8
”)
6 .3 Filling the cooling system
• Remove the lid from the expansion tank (7) and fill the cooling
system.
Use a mixture of 40% antifreeze (on ethylene glycol basis) and
60% clean tap water and coolant or use coolant liquid only.
• Add liquid until the expansion tank is about half full.
7
Expansion tank
• Fit the expansion tank (7) at an easily accessible place above the
highest level of the electric motor.
• Always use a flexible hose with internal diameter 12 mm (1/2”)
for the connections between the keel cooler, expansion tank and
motor.
• Keep the hoses as short and with as few bends as possible.
• Only use water and/or soap, thus no fatty or oily products, to help
make fitting the hoses to the hose connection points easier.
• Tighten each hose connection using rust-proof steel hose clamps.
- The keel cooler should also stay under water when the ship is roll-
ing.
- Mount the keel cooler with the packing washers (A), washers (B)
and nuts provided.
• Use a sealant when mounting the keel cooler against the hull.
6 .4 Connections
n
ote
After installation of the cooling water system, before commis-
sioning, check the following points:
- Coolant leakage
- All hose and cable connections, bolts, nuts and glands, in-
cluding the connections to the E-Line motor.
Summary of Contents for ELINE050
Page 2: ...2 370301 01 vetus Installation instructions and operation manual E Line electric propulsion ...
Page 4: ...4 370301 01 vetus Installation instructions and operation manual E Line electric propulsion ...
Page 43: ...370301 01 43 vetus Installation instructions and operation manual E Line electric propulsion ...