6.
Insert a smoke pipe on the smoke extension and push in into the chimney opening.
7.
Two threaded holes Js 6/4 "in the front boiler section must be blinded by using plugs Js 6/4".
Mounting of the jackets
1.
Remove the jackets from the carton package.
2.
Put down the insulation on the boiler drum.
3.
Mount the side parts of the jacket on the anchor bolts and attach them by using washers and nuts.
4.
Insert the thermo-manometer into the upper part of the jacket.
5.
Put the upper part of the jacket on the side parts of the jacket and screw on by using the screws
ST 4.8 x 13.
1. Boiler drum insulation
2. Left side part of the jacket
3. Washer 10,5 (4 pc)
4. Nut M10 (4 pc)
5. Right side part of the jacket
6. Washer 10,5 (4 pc)
7. Nut M10 (4 pc)
8. Upper part of the jacket
9. Screw
ST 4,8 x 13 (4 pcs for 3 – 5 sect., 6 pcs for 6 – 10 sect.)
10. Thermomanometer
Fig. no. 8
Jacket assembly of the boiler