Operator
’s Manual Backhoe Series BH
- Page 45 of 91 -
Version 2.0
◼
Position the unit, so the Backhoe
swing post is over the centerline of
the trench connection.
◼
Dig with the Backhoe at extreme
swing positions and as close to the
stabilizers as possible.
◼
Pile the spoil on the opposite side of
the trenches.
◼
Position the unit forward with the
lift and crowed levers so the two
trenches can be connected.
◼
Pile the spoil on the opposite side of
the trench.
Side slope excavating or trenching
◼
Dig with a backhoe uphill whenever
possible.
◼
Level the backhoe on slops with the
stabilizers to dig plumb trenched, or
use the backhoe or loader to cut a
level slot for the uphill wheel and
stabilizer. Pile the soil from the
space on the low side.
Summary of Contents for BACKHOE BH6
Page 1: ...Operator s Manual BACKHOE SERIES BH6 BH7 BH8 VERSION 2 0 EN 2022...
Page 6: ...Operator s Manual Backhoe Series BH Page 6 of 91 Version 2 0...
Page 89: ...Operator s Manual Backhoe Series BH Page 89 of 91 Version 2 0 Excavation Specifications BH6...
Page 90: ...Operator s Manual Backhoe Series BH Page 90 of 91 Version 2 0 Excavation Specifications BH7...
Page 91: ...Operator s Manual Backhoe Series BH Page 91 of 91 Version 2 0 Excavation Specifications BH8...