vi
Installation Checklist
After the cabinet has been installed, leveled and cleaned as described, refer to the following
checklist prior to start-up.
Check for proper electrical hook-up.
Check exposed refrigeration line connections for leaks. Make sure refrigeration lines are
not dented, kinked or rubbing.
Check condenser fan for freedom to rotate without striking any stationary members.
Check that cabinet is level.
Product Load
After the refrigerator or freezer has been started and reaches the proper storage temperatures,
food may be loaded. For optimum energy efficiency, we recommend allowing a 1-1/2” clearance
between the interior cabinet wall and product load.
Summary of Contents for FS-1D-S7
Page 4: ......
Page 13: ...NOTES xi ...
Page 14: ...xii xii 1 2 3 SECTION REFRIGERATOR ...
Page 15: ...1 SECTION FREEZER ...
Page 16: ...2 SECTION FREEZER xiv ...
Page 17: ...xv 3 SECTION FREEZER ...
Page 18: ......