10
WARNING: Risk of explosion! Never install the controller in a sealed enclose
with batteries! Do not install in a confined area where battery gasses can
accumulate.
Step 1: Choose Mounting Location
Locate the controller on a vertical surface protected from direct sun, high temperature,
and water.
Step 2: Check for clearance
Place the controller in the location where it will be mounted. Verify that there is
sufficient room to run wires and that there is sufficient room above and below the
controller for air flow.
Figure 3-1 Mounting and cooling
Step 3: Mark Holes
Use a pencil or pen to mark the four (4) mounting hole locations on the mounting
surface.
Step 4: Drill Holes
Remove the controller and drill 4.5mm holes in the marked loc ations.
Step 5: Secure Controller
Place the controller on the surface and align the mounting holes with the drilled holes
in step 4.
Secure the controller in place using the mounting screws.
150mm(5.9inches)
Warm air
Cool air
150mm(5.9inches)
Summary of Contents for Bluesolar-10
Page 2: ...Manual EN Appendix BlueSolar Charge controller 12 24V 10A with timer ...
Page 3: ......
Page 5: ...2 ...
Page 31: ...28 ...