Components installation
48
80028124_030_A – 773701 – 2021-04-29
6.8
On / Off button wiring
4.
Re-mount the plastic lighted
panel by passing the cable
through the hole and fixing the
screws over the ceiling with
washers and nuts.
5.
Connect power to the cable
connected to the Truelink 4
Main Unit on the On-Air port
following the diagram on the
side.
Step
Image
ON AIR
LAMP
TL4
ON AIR ctrl port
Step
Image
1.
Use the CAT 7 cable to wiring
the on/off button. This button
is needed to turn the system on
and off from the operating
room.
LED + (12V)
Contact closure
Contact closure
LED GND
Summary of Contents for TAC500920K
Page 1: ...Service Manual Truelink 4 Video Management System ENGLISH en US...
Page 2: ...This page is intentionally blank...
Page 6: ...Truelink 4 6 80028124_030_A 773701 2021 04 29 This page is intentionally blank...
Page 113: ...This page is intentionally blank...
Page 114: ...80028124_030_A 773701 2021 04 29...