3
Handling
3.1
Assembly information
3.1.1
Required material and tools
The following tools are required for mounting:
n
cutting knife
n
Fork spanner (size 27)
n
flat-blade screwdriver
3.2
Assembly
3.2.1
Insert cartridge valve
Requirements:
n
The pre-wall element has been mounted.
n
The tiling work is completed.
n
The revision opening is freely accessible.
n
The urinal ceramic has been mounted.
▶
Cut into the sticky tape of the shaft cover.
Tool
Handling
Urinal flush plate for Prevista Visign for Style 20
7