▶
Insert the actuator.
Observe proper alignment.
▶
Apply the installation frame.
▶
Place the sleeve over the actuator.
▶
Secure the sleeve with a 90° clockwise turn.
▶
Slide the retaining bolt in.
▶
If necessary, remove the retaining bolts again and cut the segments
to length.
▶
Slide the retaining bolt in as far as it will go.
煉
Handling
Urinal flush plate for Prevista Visign for Style 23
12