Cut the gypsum cardboard cladding panel to size.
Clad the module with suitable gypsum cardboard cladding panels.
Remove the site protection.
Cut the shaft of the concealed connection box flush with tiles.
Final assembly of the con‐
cealed connection box
Handling
Prevista Dry Plus washbasin module with concealed connection box
14 from 19