45
IM-HC 599871 0321 RABS
Hardware Set-Up Procedures
4 Hardware Set-Up Procedures
4.1
Hardware Operation Method Requirements
The requirements for each hardware operation method are listed below.
4.1.1 Method 1 – Zone Control via Power Level
If flow meters are used on the supply header of the manifold, they
must be full open.
The following components must be mounted, assembled, attached
and connected to the control unit: the circuit hubs, powerheads, and
supply sensor.
The integrated power adapter inside of the control unit must be
plugged in.
4.1.2 Method 2 – Zone Control via Thermostat
In addition to operation method 1:
Thermostat(s) with a power source.
– Two alkaline AA batteries.
– Optional: power adapter (model 1250.7US).
Optional: range extender(s) with power adapter(s).
4.1.3 Component Identification
Viega recommends noting the serial number of each control unit, any
thermostat(s) associated with that control unit, and the building location
of each item. Note the serial number and password of an associated
WLAN module too. This information will be useful if the operation
software is used.
Control unit serial numbers are located on the integrated
power adapter. Thermostat serial numbers are located on
the rear side of the PCB. The WLAN module serial number
and password are located on a sticker attached to the
plastic housing.
4.2 Method 1
–
Zone Control via Power Level
Power levels can be assigned to each circuit using the button on the
circuit hub, or via the operation software.
EG
1.OG