background image

Sirijus 20, 30 

 

 

 

 

 

 

 

 

          Sirijus 20, 30 

 

                   Sirijus 20, 30 (13.05) V1 LT           Sirijus 20, 30 (13.05) V1 LT 

Dear Buyer

!  

 
Thank You for purchasing our company’s article and for the confidence in products of JSC 
“UMEGA”.  
 
We wish you success in use of it! 

JSC “UMEGA” 

 
 

1.GENERAL INFORMATION 

 
Solid fuel boilers “SIRIJUS-20”, “SIRIJUS-30” (hereinafter – the boiler) are intended for: 
- heating of residential houses,  
- heating of administration offices or industrial premises.  
 
Fuel suitable for the boiler *:  
- wood,  
- coal 
- peat briquettes,  
- compounds of the above listed fuels.  
 
* fuel wetness not exceeding 20%  
 
Boiler  “SIRIJUS”  are  designed  in  compliance  with  all  the  applicable  up-to-date  economic, 
environmental, and safety requirements and have good performance characteristics. 
 
Shell is a welded carbon steel sheet of 5-4 mm thickness, with channels where water circulates. 
The boiler has:  
- Primary and secondary air supply,  
- high degree of heat insulation,  
- a high efficiency coefficient. 

 
 
 
 
 
 
 
 
NOTICE!  Before  installation  and  operation  of  the  heating  boiler-oven,  please  read  this 
manual.  This  will  help  You  to  properly  install  and  the  most  effectively  use  the  product 
purchased and to avoid accidents. 
When  buying  the  boiler,  please  read  terms  of  warranty,  make  sure  that  the  certificate  of 
acceptance is filled in completely and correctly. 
 
 
 
 

 

 

12. WARRANTY CLAIM FORM

 

 

To General Director of JSC “Umega” 

 

I .................................................................................. have acquired the product made by 

(name, surname or name of company) 

your company:......................................................................., serial No. 

…………......…………., … 

(product name) (date of manufacture)  
…...…………………………………………... ……………………………………………….…………… 
(date, place of purchase, name and number of the purchase document)  

 

I  have  read  the  product  data  sheet  and  hereby  declare  that  the  product  has  been  installed  in 
accordance with the requirements, established by the manufacturer in the data sheet, and is used 
for its intended purpose, without violating the requirements of the operation manual. Given that, I 
have the following claim against this product:  
…………………….…………………….…………………….......…………………..………………….  
…………………………………………………………………….......………………………………….  
…………………………………………………………………………... ...………………………….…  
……………………………………………………………………………….......………………….……  
…………………………………………………………………………………….......………….………  
………………………………………………………………………………………….......….…………  
…………………………………………………………………………………………….........…………  
…………………………………………………………………………………………….……........……  
…………………………………………………………………………………………….……………....  
 

…………………………………………………………………………………………….……………...  

…………………………………………………………………………………………….……………....  
Assuming that the deficiencies, expressed in the claim, were affected by defects of your product, 
please send your representative to inspect the product installed, detect the defects, and eliminate 
them. If these deficiencies are found to have occurred due to improper connection or use of the 
product, or there are no defects under the warranty, I shall undertake to cover travel expenses for 
the arrival of your representatives (0.8 Lt/km) and the time spent on travel and on-site inspection 
30 Lt/h) to each employee of the service team (no more than to three employees). 

 

If, within  7  calendar days,  I  fail  to  cover the  above  expenses,  I agree  to  recovery  of  them 
against me in the manner prescribed by the legislation of Lithuania. 

 
My address ……………………………………………., phone…. ……………………. 
……………………………………………………………………………………………..  
Name, surname    

 

 

 

Signature 

 
 
 
 
 

 
 
 
 
 

Summary of Contents for SIRIJUS 20

Page 1: ...Technical Datasheet installation and Operation Manual 3 SOLID FUEL BOILERS SIRIJUS 20 SIRIJUS 30 LST EN 303 5 GOST 20548 ENG Sirijus 20 30 13 05 V1 LT ...

Page 2: ...eipt purchase of the product signature Table of Contents 1 General information 4 2 Technical Data 5 3 Description of the Design 6 4 Transportation and Storage 7 5 Installation of the boiler 7 5 1 Mounting location 7 5 2 Chimney and Flue 7 5 3 Connection to the Heating System 8 5 4 Connection of the Boiler Cooling System 10 6 Operation of the Boiler 12 6 1 Firing 12 6 2 Adjustment of Draft Control ...

Page 3: ...ificate of acceptance is filled in completely and correctly 12 WARRANTY CLAIM FORM To General Director of JSC Umega I have acquired the product made by name surname or name of company your company serial No product name date of manufacture date place of purchase name and number of the purchase document I have read the product data sheet and hereby declare that the product has been installed in acc...

Page 4: ...applicable to the product from that day I have read the terms of warranty _______________________________________________________ Buyer s surname signature and date In the event of faults during installation or use of the boiler please call 370 687 95628 370 340 60532 370 340 60533 370 340 60538 If you have claims against the product quality please fill in the warranty claim form and along with a ...

Page 5: ...ose the rest of them according to environmental requirements 9 RISK ANALYSIS AND TROUBLESHOOTING Problem Cause Action Temperature of the heat carrier above the allowable level Thermostatic cooling valve has not been installed bottom door is opened automatic pressure adjustment does not operate recycling pump does not operate lost electricity Be sure to install the thermostatic cooling valve into t...

Page 6: ...he firegrating there is an ash box 7 which can be removed by opening the bottom door 16 The bottom door is fitted with a primary air suction valve 8 which is controlled by an automatic temperature controller 10 by using a lever 12 and the chain 11 The temperature controller is fitted in the right part of the boiler In front there is fitted a thermometer 13 showing a temperature of the heat carrier...

Page 7: ...r supply valve 17 Hang off the chain 11 from the primary air suction valve 8 the valve as well as the bottom door 16 must be closed Then carefully semi open the top door wait 2 3 seconds and carefully open the top door The smoke should not enter the room If the room gets smoked it means that any of the valves may be still closed or the primary air suction valve is still opened After loading a fuel...

Page 8: ...valve 8 at the bottom door Adjust the temperature controller lever so that the scale reading could match the reading of the boiler thermometer the length of chain 11 is selected so that the primary air suction valve is closed Keep in mind that the bolt that fixes the temperature controller lever to the plug should be in front while the lever should be positioned as shown on Picture 1 that is slope...

Page 9: ... close to the boiler water conduit pos 20 as possible see Picture 1 It can be mounted in a vertical or horizontal position The valve must not be mounted with a valve head downward see Picture 3 Forbidden Position Picture 3 Mounting positions of the thermostatic cooling valve Regulus DBV 1 A valve tube A see Picture 4 is connected to the cold water conduit pressure in the system should not exceed 6...

Reviews: