background image

Installation instructions

for contractors

VIESMANN

Vitosol-F
Type SV and SH

Flat-plate collector for elevated installation

VITOSOL-F

5675 789 GB

2/2015

Dispose after installation.

Summary of Contents for VITOSOL 100-F

Page 1: ...Installation instructions for contractors VIESMANN Vitosol F Type SV and SH Flat plate collector for elevated installation VITOSOL F 5675 789 GB 2 2015 Dispose after installation ...

Page 2: ...tion Target group These instructions are exclusively intended for author ised contractors Regulations to be observed National installation regulations Statutory regulations for the prevention of accidents Statutory regulations for environmental protection Codes of practice of the relevant trade associations All relevant safety regulations as defined by DIN EN DVGW VDE and locally applicable standa...

Page 3: ...l 6 for 1 collector 5 Retaining rail 7 for 2 collectors 6 Cross brace 6 Installation aid template 6 2 Installation sequence Determining collector row clearance z 8 Fitting the collector supports 8 Installing the cross braces 10 Installing the collectors 10 Connecting the collectors 12 Installation 14 3 Commissioning 16 Index 5675 789 GB ...

Page 4: ...ns Only operate the collectors with heat transfer medium approved by the manufacturer Intended use presupposes that a fixed installation in conjunction with permissible system specific compo nents has been carried out Commercial or industrial usage for a purpose other than heating a building or DHW shall be deemed inap propriate Any usage beyond this must be approved by the man ufacturer in each i...

Page 5: ...component assemblies are available for collector types SV and SH for a 30 45 or 60 angle of collector inclination Collector support standard kit and collector kit extension Standard kit 2 collector supports Extension 1 collector support 4 2 1 3 5 Fig 1 1 Collector support with footplates 2 Washer 7 8 4 mm 3 Hexagon bolt M 8 x 25 4 Clamping bracket 5 Self tapping screw Retaining rail 6 for 1 collec...

Page 6: ...brace 8 9 qP 2 Fig 4 2 Washer 7 8 4 mm 8 Cross brace 9 Hexagon nut M 8 qP Hexagon bolt M 8 x 20 Installation aid template To prevent slipping of collectors during installation qQ qW Fig 5 qQ Template qW Hinged plug Product information cont 5675 789 GB ...

Page 7: ...ion Retaining rail Cross brace 1 collector 2 collectors 1 1 1 1 2 1 1 1 1 3 2 1 1 1 4 2 1 2 1 5 3 1 2 1 6 3 1 3 2 7 4 1 3 2 8 4 1 4 2 9 5 1 4 2 10 5 1 5 2 Type SH Number of collec tors Number of component assemblies Standard kit Extension Retaining rail for 1 collector Cross brace 1 1 1 1 2 1 1 2 1 3 2 3 1 4 2 1 4 1 5 3 5 1 6 3 1 6 2 7 4 7 2 8 4 1 8 2 9 5 9 2 10 5 1 10 2 Product information cont 5...

Page 8: ...45 9600 4260 60 10890 4830 Kassel 30 6385 2845 45 7840 3480 60 8720 3870 Munich 30 5595 2485 45 6710 2980 60 7350 3260 Fitting the collector supports Observe the maximum load and distance from the edge of the roof for the on site substructure to DIN 1055 Install the on site substructure e g steel beams at right angles to and horizontally level with the collec tor orientation Provide screws on site...

Page 9: ...m 2580 1000 Number of col lectors y in mm Type SV Type SH 1 1080 2400 2 2155 4805 3 3235 7205 4 4310 9610 5 5390 12010 6 6470 14410 7 7545 16815 8 8625 19215 9 9700 21620 10 10780 24020 11 11860 26420 12 12935 28825 13 14015 31225 14 15090 33630 15 16170 36030 Fitting the collector supports cont 5675 789 GB ...

Page 10: ... install the cross braces holes in the collector sup ports and the cross braces must be drilled on site 1 2 3 5 4 6 7 8 9 10 11 1 8 Fig 8 1 0 0 Ø 8 5 4x 2 9 qP 8 2 Ø 8 5 9 2 qP 3 1 4x 1 Fig 9 Installing the collectors Connection pipes packed separately A r m a t u r e n f e t t Fig 10 Installing the cross braces 5675 789 GB ...

Page 11: ...side Please note The connection pipes must be free of any signs of damage Lubricate O ring seals only with the special valve grease provided Use the template as an aid for installing the second collector and all others between the supports Once the second collector has been secured remove the template and install it between the next pair of sup ports qQ qW 1 Fig 11 Installing the collectors cont 5...

Page 12: ... to the number of collectors C Connection pipe D Type plate 5 Do not tighten the clamping brackets between 2 collectors until the next collector has been connec ted to the previous one Connecting the collectors The connection and sensor well sets are packed sepa rately Installing the collectors cont 5675 789 GB ...

Page 13: ...y of the solar control unit Installation information Lubricate O ring seals only with the special valve grease provided Initially tighten the union nut by hand then tighten with an open ended spanner by a further turn Never use annealed copper pipes with locking ring fittings Connecting the collectors cont 5675 789 GB ...

Page 14: ...m immediately after installation Therefore protect the collectors from insolation by covering them up Installation Please note Incorrect installation can lead to collector dam age Use only gunmetal or brass fittings and copper pipes for the installation Never step on collectors Never solder on or near the collectors Connecting the collectors cont 5675 789 GB ...

Page 15: ... glycol resistance Hemp connections insufficiently gas tight Equip the system to EN 12975 with an expansion vessel safety valve and circulation pump The expansion vessel must be approved to DIN 4807 The diaphragms and seals of the expansion vessel and safety valve must be suitable for the heat trans fer medium To calculate the pre charge pressure see the Vitosol service instructions For operation ...

Page 16: ...elford Shropshire TF1 7YP GB Telephone 44 1952 675000 Fax 44 1952 675040 E mail info uk viessmann com Viessmann Werke GmbH Co KG D 35107 Allendorf Telephone 49 6452 70 0 Fax 49 6452 70 2780 www viessmann com 5675 789 GB Subject to technical modifications Commissioning ...

Reviews: