6
For further information regarding the individual steps, see the page indicated
Commissioning steps
Inspection steps
Maintenance steps
Page
•
1. Checking the domestic ventilation system
..................
7
•
•
•
2. Starting the Vitovent
.......................................................
8
•
3. Setting the language, time and date
.............................
8
•
4. Setting the air flow rate for operating modes
..............
9
•
5. Duct system (flat) metal: Pre-selecting the supply/
extract air apertures
....................................................... 10
•
6. Duct system (flat) plastic: Pre-selecting the supply/
extract air apertures
....................................................... 28
•
7. Adjusting the air flow rate
.............................................. 34
•
•
•
8. Shutting down the system
............................................. 36
•
9. Opening the appliance
................................................... 37
•
10. Cleaning Vitovent, countercurrent heat exchanger
and filter mats (replacing if required)
........................... 38
•
11. Cleaning the plastic duct system (flat)
......................... 40
•
•
12. Checking the condensate drain
.................................... 40
•
13. Installing a countercurrent heat exchanger and
closing the Vitovent
........................................................ 40
•
•
•
14. Checking the firm seating of electrical plug-in
connections and cable entries
•
•
•
15. Closing the appliance and commissioning the system
•
16. Instructing the system user
........................................... 40
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5608 999 GB