Installation
VITOBLOC 200
CHP unit accessory • Operating and installation instructions • Remote reset
7
5838316
GB
Positioning the
control panel
The cables are inserted from below in such a way that a minimum height must be
observed.
Install the control panel in a suitable place. Ensure that the installation does not
cause any hazards (suitable working height, no impact point in the passage area,
suitable ambient conditions).
Control panel dimensions
Electrical installation
Before starting work, switch off the power supply to the unit and check that it is
voltage-free.
For the connection of the unit controller and the retrofit kit for remote
acknowledgement, the cables or leads listed in the bill of material must be used in
accordance with the wiring diagram. The stripped wire ends must be fitted with
wire ferrules.
The cables or leads are routed outside the unit using standard installation
material, whereby the existing cable-carrying systems should be used.
As a rule, ensure that this wiring does not give rise to a hazard that could cause
an accident.
Carry out the wiring in accordance with the corresponding wiring diagram.
After completing the cabling and wiring work, the wiring must be checked for
correct connection.
Caution when switching the power supply back on!
Mounting plate
Dimensions for wall mounting