48
E
A
C
D
B
Fig. 38
1.
Reconnect the loading cylinder to the pipework.
2.
Insert new gasket
A
underneath flange cover
B
.
3.
Fit flange cover
B
and tighten eight screws
D
with a maximum torque of 25 Nm.
4.
Push earth cable
C
onto the tab.
5.
Fit cover
E
(two-part design up to 26 kW).
6.
Fill the loading cylinder with potable water.
Checking the expansion vessel and system pressure
A
Fig. 39
Commissioning, inspection, maintenance
Re-assembling and filling the loading cylinder
5789 302 GB
Summary of Contents for B2TB
Page 6: ...6 15 Keyword index 152 Index Index cont 5789 302 GB ...
Page 117: ...117 Parts lists Hydraulics 5789 302 GB Components ...
Page 154: ...154 5789 302 GB ...
Page 155: ...155 5789 302 GB ...