Clearance dimensions
700
500
1000
500
Fig. 1
Delivery and handling
The boiler is delivered on a wooden pallet.
The following components are delivered in individual
packages:
■
Casing and thermal insulation; see Fig. 4
■
MatriX cylinder burner
■
Control unit
■
Cable set
■
Programming module
■
Programming unit
■
Set with technical documentation
■
Venturi extension, part of standard delivery only for
burners from 200 kW and open flue operation
A
C
B
Fig. 2
1.
Remove bag with boiler flue connection, flue gas
temperature sensor, retaining bracket and trap and
put aside.
2.
Position the ramp against the pallet.
3.
Remove the transport brackets.
4.
Roll the boiler down the ramp backwards in a
straight line.
Danger
The boiler can cause serious injury if it over-
turns.
At least 2 people are required to move the
boiler. Roll the boiler in a straight line.
Alternative transport aids
A
Crane lug
B
4 holes to slide poles through for lifting
C
Option for pallet truck insertion underneath
Preparing for installation