129
Boosting DHW heating
The booster heating function is activated
if a switching period is selected for the
fourth time phase.
The set temperature value for the heat-
ing boost is adjustable in coding address
"58".
Internal extensions
Internal extension H1
The internal extension H1 is integrated
into the control unit casing. The cylinder
primary pump is connected to relay out-
put
sK
.
An external safety valve can be connec-
ted to
gD
Function description
Control unit
(cont.)
5412 755 GB
Service