138
When the screed drying function is acti-
vated, the heating circuit pump of the
mixer circuit is switched ON and the flow
temperature will be held in accordance
with the selected profile. After comple-
tion (30 days), the mixer circuit will again
be regulated automatically via the set
parameters.
Observe EN 1264. The report to be pro-
vided by the heating contractor must
contain the following heat-up details:
■ Heat-up data with respective flow tem-
peratures
■ Max. flow temperature achieved
■ Operating conditions and outside tem-
perature during handover
The various temperature profiles are
adjustable via coding address "F1".
The function continues after power fail-
ure or after the control unit has been
switched OFF. "Heating and DHW" will
be started after the screed drying func-
tion has been terminated or if code
"F1:0" is manually adjusted.
Temperature profile 1: (EN 1264-4) code F1:1
Flow temperature °C
1
5
10
15
20
25
30
Days
50
40
30
20
10
Temperature profile 2: (ZV parquet and flooring technology) code F1:2
Flow temperature °C
Days
50
40
30
20
10
1
5
10
15
20
25
30
Function description
Control functions
(cont.)
5412 755 GB