48
Returning the primary store into use
F
E
A
C
D
B
1.
Reconnect the primary store to the
pipework.
2.
Insert new gasket
A
underneath
flange lid
B
.
3.
Fit flange lid
B
and tighten eight
screws
D
with up to 25 Nm torque.
4.
Push earth cable
C
onto the tab.
5.
Fit T&P valve
E
.
6.
Fit cover
F
.
7.
Fill the primary store with drinking
water.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5412 755 GB