6
Vitodens 242-F, FB2B
Set up for operation with natural gas H.
For conversion to LPG P (without conversion kit), see page 32.
The Vitodens 242-F should generally only be delivered to those countries specified
on the type plate. For deliveries to alternative countries, an approved contractor, on
his own initiative, must arrange individual approval in accordance with the law of the
land.
Preparing for installation
Handling
If possible, leave the boiler on the pallet
during handling.
If space constraints make it necessary,
the boiler can be split for handling.
Installation instructions provided
!
Please note
To prevent equipment damage,
never set the boiler down on
its front or side panels or apply
loads to these areas.
Installation
Required room height at least 2100 mm.
The boiler weight is 161 kg (19 kW) to 165 kg (26 kW) (dry).
Preparing the boiler for installation
Use a connection set, available as an
accessory, to make the connection on
the gas and water sides. The following
overview shows sample connection sets
for installation on finished walls to the top
or side.
!
Please note
To prevent equipment damage,
install all pipework free of load
and torque stresses.
Preparing the connections on site:
Connection set installation
instructions.
Preparing for installation
Product information
5412 755 GB