27
Note
If the control unit has not been
switched on prior to filling the system,
then the servomotor of the diverter
valve will still be in its central position,
and the system will be completely fil-
led.
Note
Lever on valve
B
must be in the
"l.h." position.
4.
If the control unit had already been
switched on before filling began:
Switch control unit ON and activate
filling program (see next steps).
Note
For function and details of the fill pro-
gram, see page 137.
5.
Close boiler drain & fill valve
A
.
Activating the filling function:
1.
Press
OK
and
simultaneously for
approx. 4 s.
2. "Service functions"
3. "Filling"
4.
Ending filling function:
Press
OK
or .
Changing the language (if required)
Note
At the commissioning stage, the display
is in German (default setting)
Extended menu:
1.
å
2. "Settings"
3. "Language"
Sprache
Cesky
CZ
Deutsch
DE
Dansk
English
DK
GB
Wählen mit
Ø
ç
4.
Set the required language with
/
.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5412 755 GB
Service