Installation
Controller Connection
WARNING
Prior to commencing electrical work on the controller,
disconnect the mains plug to avoid possible electric
shock! Only after completing all installation work,
plug the mains plug of the controller into an outlet.
This avoids an unintentional start of the motors.
Refer to the separate instructions
regarding the controller.
Fig. 9 Possible connection diagram
1. Connect the temperature sensors:
-
Collector sensor (TCOL) to S1. Install the sensor in
the sensor well kit provided with Vitosol collectors.
Connect to the control using 18/2 thermostat wire.
-
Tank return (TSEC) to S2. The sensor is preinstalled in
the isolation valve in the storage tank return live. Use the
quick-connect plug to join together the sensor wire and
pre-wired sensor cable from the control.
-
Storage tank sensor (TST) to S3. Install sensor at the
same level as the tank supply inlet. Install in an
immersion sensor well, if possible.
-
Solar return line sensor (TPRI) to S4. This sensor is
pre-installed in the Solar-Divicon-HX.
2. Tighten all union nuts and screw connections.
The assembly of the heat transfer station is now
completed and you can put the station into operation.