30
10.
Connect the DHW cylinder to the pipework and fill
(see page 27).
Checking and replacing the protective magnesium anode
■
We recommend checking the function of the protec-
tive magnesium anode annually. This check can be
carried out without interrupting operation. The earth
current is tested with an anode tester.
■
A maintenance-free impressed current anode is
available as an accessory.
Testing the anode earth current with an anode tester
Open the DHW heat pump (see page 26).
A
2.
Fig. 23
3.
Connect the tester in series between the tab and
earth cable and measure the current:
■
> 0.3 mA:
Protective magnesium anode is in working order.
■
< 0.3 mA:
Carry out a visual inspection of the protective
magnesium anode.
4.
If a visual inspection is necessary, drain the DHW
cylinder down to the installation height of the pro-
tective magnesium anode via the drain outlet (see
page 40).
Note
Replace the protective magnesium anode if the
visual inspection indicates that it has been reduced
to a diameter of 10 to 15 mm.
New protective magnesium anodes are 500 mm
long and have a diameter of 26 mm.
Type T0S-ze: Checking the connections on the heat generator or the solar
thermal system for leaks
Checking the fan for free rotation
Danger
Contact with the fans while they are operating
can result in serious cutting injuries.
■
Isolate the appliance from the power supply
and check that it is no longer live. Safeguard
against unauthorised reconnection.
■
Do not open the appliance until the fan has
come to a stop.
Commissioning, inspection, maintenance
Cleaning the interior of the DHW cylinder
(cont.)
6136003