Standard Equipment
VITOROND 200, VD2A
13
Standard Equipment
Note:
Boiler controls and burners are purchased separately. Please see Price List for details.
H
The cast iron sections are delivered as a
block or loose individual units on skids.
H
The combustion chamber door with
burner plate comes mounted on the front
section.
H
The flue gas collector, with two
inspection opening covers (fastened with
screws), is mounted on the rear section.
1 carton containing supply header
1 carton containing insulation panels and
cleaning brushes
1 carton containing the boiler control
1 carton containing installation fittings with
safety header
Standard equipment includes:
– Boiler base with leveling bolts
– Connection piping with counter flanges and
gaskets
– Turbulators are packed in a bag and placed
inside the combustion chamber
When cast iron sections are delivered as
individual units:
– Push nipples, high temperature silicone and
linseed oil with graphite based sealant are
packed in a carton and placed inside the
combustion chamber
Ensure
specific regional, provincial, or
state requirements, such as fuel train and
additional safety control requirements
etc., are known before the product order
is placed, to determine proper burner
selection and pricing.
5
3
5
4
7
8
7
v
1
.2
IMPORTANT