11
5608 487
v1.2
Vitocell 100-V Installation Instructions
Set-up and Connections
1. Fit the thermal insulation blanket below the tank prior
to the installation of the tank itself.
2. Position and level the DHW tank with its leveling bolts.
Levelling and bottom thermal insulation
All necessary parts for enclosure assembly are packaged
in a separate carton.
CAUTION
The thermal insulation must not come in contact with
open flames. Exercise extreme caution when welding
and soldering.
IMPORTANT
Do not extend the leveling bolts beyond an overall
length of 1½ in. (35 mm).
120 USG (450 Liter) Tank Installation
(continued)