14
5600 332 v1.3
Vitodens 100-W, WB1B Installation & Service
Dimensions
Preparing the Connections
(continued)
Legend
BWR
Boiler water return, ¾”
BWS
Boiler water supply, ¾”
BD
Boiler drain
BF
Boiler fill
GC
Gas connection, ¾” NPTM (male thread)
PRV
Pressure relief valve
PG
Pressure gage
VC
Venting connection
CAI
Combustion air inlet connection (optional)
This section is an overview only! Refer to subsequent sections for detailed information on individual piping connections.
Piping connections for Vitodens 100-W, WB1B 26 and 35 (factory supplied)
Note:
If using the optional CombiPLUS see page 10 and 24.