16
Observe the local waste water regula-
tions.
Note
Fill the siphon with water before com-
missioning.
Flue gas connection
Note
■ The labels "System certificate" and
"Skoberne GmbH flue system"
enclosed with the technical documen-
tation may only be used in conjunction
with the Viessmann flue system made
by Skoberne.
■ During installation and positioning of
the flue system, observe Part L and
BS 5440 building regulations
(only
g
)
Connecting the balanced flue
Flue system installation instruc-
tions
Do not carry out
commissioning
until
the following conditions are met:
■ Free passage through the flue gas
pipes.
■ Flue system with positive pressure is
gas-tight.
■ Apertures for ensuring sufficient com-
bustion air supply are open and cannot
be closed off.
■ Applicable regulations on installing
and commissioning flue systems have
been followed.
Danger
Leaking or blocked flue systems
or an insufficient supply of com-
bustion air cause life threatening
poisoning due to carbon monox-
ide in the flue gas.
Ensure the flue system functions
correctly. Apertures for combus-
tion air supply must not be able to
be closed off.
Installing the boiler
Condensate connection
(cont.)
5773 216 GB
Summary of Contents for Vitodens 222-F B2TA series
Page 12: ...12 2 5 1 4 2x 3 Installing the boiler Removing the front panels 5773 216 GB...
Page 13: ...13 1 2 SW17 Installing the boiler Siting and levelling the boiler 5773 216 GB Installation...
Page 31: ...31 4 1 5 2 2x 3 Installing the boiler Fitting the front panels 5773 216 GB Installation...
Page 194: ...194 5773 216 GB...
Page 195: ...195 5773 216 GB...