Vitosol 100-FM/200-FM Installation, Operating and Service
21
5786 604 - 02
1. Observe the max. load and distance from the edge
of the roof for on-site substructure.
2. Remove any gravel etc. from the installation area,
cover the surface with protective building mats or
foam insulation and position concrete slabs on top
of the mats or insulation.
3. Secure the support base rail
2
(use as drilling
template) onto the concrete slabs (bolts supplied
by
others).
4. Secure retaining bracket
9
to the bottom of all
collector supports; do not yet tighten screws.
5. Secure support braces
onto the retaining
plates between the second and third, the fourth
and fifth supports etc. Tighten all bolts.
CAUTION
A structural engineer must be consulted to ensure that
the existing roof structure is capable of carrying the
additional weight of the collectors, insert weights and
support slabs.
Installing Freestanding Installation
(with ballast - for Model SH only)
X
Y
Collector model SH
inches
(mm)
75
f
(1920)
18
(481)
Note:
See page 16 for numbered component description.
Note:
Use the base rails as a drilling template.
Installation on Flat Roofs
or Freestanding Installation