Installation on a Wall
41
Installing the Connection Housing
Centering groove
Note:
See page 37 for numbered parts
description.
Turn T-slot bolt
90°
for all installation
steps.
1.
Position the connection housing
onto the mounting rails
and click
into the retaining plates
.
2.
Align the connection housing.
The tube holders on the installation rails
must be in alignment with those in the
connection housing; align with string if
necessary.
3.
Mark the fixing points at the back of
the connection housing. Use the
centering groove as a template.
4.
Drill holes, Ø
3
/
8
” / 9mm
5.
Secure the connection housing with
T-slot bolt
5
,washer
6
and nut
7
.
6.
Where several collectors are installed
one above the other, continue with
“Joining the Connection Housings”
on the following page, otherwise
continue with “Installing the Vacuum
Tubes and the Collector Temperature
Sensor” on page 43.
5
3
6
8
5
3
8
v
1
.1
5.
90º
3.
4.
9 mm
IMPORTANT