Appendix
50
Post-Installation Information...
Checklist
j
Has the solar circuit been installed in
accordance with the circuit diagram
and all relevant standards?
j
Have the collectors been installed
with a slight upward gradient
towards the piping side?
j
Have the supply and return
connections been carried out and
pressure tested?
j
Have the electrical connections been
carried out correctly?
j
Have the sensors been installed
correctly?
j
Have air vent valves been installed at
the highest points of the system and
are they open?
j
Have all screws, screwed pipe
connections and covers been securely
tightened?
j
Has the domestic hot water tank
been filled with water?
j
Does the maximum capacity of the
expansion vessel correspond to the
value stated in the System Design
Guidelines?
j
Has the inlet pressure of the
expansion vessel been adjusted to
the system pressure?
j
Have connecting pipes been
insulated and protected from the
elements?
5
3
6
8
5
3
8
v
1
.1
It is absolutely essential to close the
air vent valves again when the
system has been started up and
de-aerated.
CAUTION