Additional information
31
Commissioning/service report
Maint./Ser
vic
e
Date:
By:
Maint./Ser
vic
e
Date:
By:
Maint./Ser
vic
e
Date:
By:
Maint./Ser
vic
e
Date:
By:
Maint./Ser
vic
e
Date:
By:
Initial
star
t−up
Date:
By:
bar
bar
bar
bar
% by vol
% by vol
% by vol
% by vol
º
C
º
C
%
%
hPa
(1hPa=1
mbar)
hPa
(1hPa=1
mbar)
mm
mm
mm
mm
read as
set
read as
after
maintenance
read as
set
read as
set
read as
set
read as
set
read as
set
read as
set
read as
set
read as
set
O
il pressure
V
acuum
Soot indicator
Carbon dioxide
content CO
2
Oxygen
content O
2
Flue gas tempe−
rature (gross)
Flue gas loss
Draught (at the
boiler end)
Blast tube con−
nection setting
Air damper
setting
5692452 GB