5
Commissioning steps
Inspection steps
Maintenance steps
Page
•
1. Filling the system on the heating water and DHW side
..................................................
6
•
•
•
2. Checking connections
.......................................................................................................
6
•
•
3. System start-up
..................................................................................................................
6
•
•
•
4. Setting the heating output
.................................................................................................
6
•
•
5. Setting the pumps
..............................................................................................................
8
•
•
•
6. Setting the cylinder temperature
...................................................................................... 11
•
•
7. Shutting down the system
................................................................................................. 12
•
•
8. Checking the function of the safety valve
•
•
9. Inspection and maintenance of the cylinder loading system
........................................ 12
•
10. Restarting the system
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5549 892 GB