Plug a standard plug into a permanently installed
standard socket.
During commissioning or after a reset, the initialisation
phase is followed by the commissioning sequence.
Commissioning sequence, individual control unit
■
During the commissioning sequence, you can jump
back to a previous commissioning step at any time
with .
■
The settings made in the commissioning sequence
can also be changed later in the relevant menus.
Display
Explanation
See page
1.
"Lang."
Set the required menu language.
2.
"Cont.type"
Set
"Ind.control."
.
3.
"Summer/winter"
Enable (
"Yes"
) or disable (
"No"
) automatic summer/winter-
time changeover.
4.
"Time"
Set the time.
5.
"Date"
Set the date.
6.
"T DHW set"
Select the set DHW temperature.
7.
"DHW circ."
■
Enable DHW circulation and set DHW circulation mode.
■
Carry out manual balancing of the DHW circulation flow
rate.
8.
"Save"
Terminate the commissioning menu with
"Save"
. The set-
tings are saved. The default display is shown on the screen.
Commissioning sequence, cascade control unit
■
During the commissioning sequence, you can jump
back to a previous commissioning step at any time
with .
■
The settings made in the commissioning sequence
can also be changed later in the relevant menus.
Display
Explanation
See page
1.
"Lang."
Set the required menu language.
2.
"Cont.type"
■
Set
"Cascade master"
at the master control unit.
■
Set
"Cascade slave 1"
,
"Cascade slave 2"
or
"Cascade
slave 3"
at the relevant slave control unit.
Note
Observe when allocating numbers: Only allocate each ad-
dress once.
3.
"Cascade master"
"Balance cascade"
At the master control unit:
Start balancing with
"Start"
. All slave control units are regis-
tered in the master control unit.
4.
"Balance cascade"
"No of slaves"
Check the number of slave control units detected at the
master control unit. If not all slave control units have been
detected, check the VBus connection and the controller type
setting on all control units.
5.
"Summer/winter"
At the master control unit:
Enable (
"Yes"
) or disable (
"No"
) automatic summer/winter-
time changeover
Commissioning
Switching the power on
5517 095 GB