30
Make all connections airtight.
System diagram
qZ
qE
qZ
qE
qT
qE
qR
qE
qW
3
qE
qU
wQ
qE
qO
wP
qU
qE
qT
qZ
qU
qU
qE
9
qIqE
3
1
wQ
qW
qT
qE
qO
wW
qO
wW
qP
3
Fig. 26
Note
If the metal ductwork (flat) is routed over 2 distribution
levels, it may be necessary to provide a butterfly valve
(on site) in the supply air duct.
Metal ductwork (flat)
Pos.
Component
System/DN
1
Vitovent 300-W
300 m
3
/h: DN 160
400 m
3
/h: DN 180
3
Pipe with female connection (EPP)
or
Flexible pipe
DN 160
DN 180
9
Silencer, round, flexible
DN 160
DN 180
Supply air/extract air ductwork: metal
5793 589 GB