19
A
4.
2.
B
1.
2x
3.
2x
Fig. 11
A
Plug-in attachment (standard delivery)
B
Terminator
Establishing the connection to the BACnet/IP gateway
The connection to the network must be established by
the system integrator.
Installation sequence
Connecting the plug-in attachment
(cont.)
6175460
Installation