• Once all the panels are in place, ensure that each is
aligned with it’s neighbors
• There will be a 1" gap between panels
• Repeat steps 1-8 for each panel on your run
10
9
Vedera Tread Installation Steps (Continued)
4
© 2022 VIEWRAIL All Rights Reserved · (866) 261-8013 · viewrail.com · For Helpful Tutorials go to www.youtube.com/viewrail
Vedera Pin Installation Instructions V8 Modified: 10/18/2022
• Using a torque wrench and a
9
/
16
" socket head, tighten
all the remaining nuts on the Vedera Pins to 23 lb ft
11
• Identify and prepare the Vedera wood covers
• Although the rubber O rings will provide a snug fit in the
predrilled holes for the wood covers, it is recommended
to use silicone on the face of the pin around the bolt
hole in order to provide additional strength
• Apply a line of silicone around each O ring
• Attach the wood covers onto each pin
• These will fit snugly and could require soft taps to place
12
We’d love to see your work! Snap a few pics with your phone and send them to pictures@viewrail.com. Thanks for choosing Viewrail. Enjoy your new installation!
Congratulations! You’re done with this section.