Place the panel in its mounting position and fix the panel to the wall using the slots of the three screws.
•
Ensure the enclosure and the inner parts of the panel are given sufficient protection during installation.
•
Enter all external cables via the 10 numbers of preformed knockouts located at top of the panel.
•
When the installation of all the cables has been completed, clean the interior of the enclosure ensuring all
machinery debris and drilling swords are removed.
2.3 Block Diagram of Panel
The following diagram shows basic components of TSGR-21 system. It consists of various smoke and heat
detectors, AC power source, Notification devices like NAC or sounder, Fire Suppression and Releasing agent Gas
based extinguishers, SCADA communication cables, all connected to control panel.
NOTE: Connect all EOL of 4.7K ohms
WARNING
:
Several different sources of power can be connected to this panel. Disconnect all sources of power before
servicing. The panel and associated equipment may be damaged by removing and / or inserting cards, modules
or inter connecting while this unit is energized.
Primary Power source (AC) and Earth Ground Connection
:
AC Power connections are made inside the control panel cabinet. A separate Earth Ground connection must be
made to ensure the proper panel operation and lightening and transient protection.
Standby Power Source (Batteries)
: