Inst. and Maint. Manual | Oxeo PR LCP | F_101921 Rev 02 | 10-2022 | en
112
When assembling the downstream pipework, only use the following unions, pipes and seal-
ants:
•
The fittings must be marked with a red dot or an imprinted “D”.
•
The pipes must be clearly marked with a 1305 psi (90 bar) stamp. Each thread cut on the
construction site must be tested with a thread gauge.
•
Only use the following sealing materials
1
:
- PTFE sealing tape
- Fermit sealing cord (silicone-free)
- Loctite 55 sealing cord (NOT silicone-free)
- Loctite AVX 586 adhesive
- Hemp MES with Neo-Fermit
- Sealant Permabond - A1046
- Sealing paste HD Stucarit 309 sealing gel
1
Check the validity and suitability for the thread size using the product sheet M1-01-04_Part1.
National requirements for sealant may differ from those mentioned above; in this case, the
national requirements take priority.
Summary of Contents for Oxeo
Page 1: ...Installation and Maintenance Manual Oxeo Inert Gas Extinguishing System...
Page 10: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 4...
Page 32: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 26...
Page 42: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 36...
Page 134: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 128...
Page 148: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 142...
Page 156: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 150...
Page 176: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 170...
Page 206: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 200...
Page 220: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 214...
Page 221: ...Oxeo PR LCP 10 2022 en 215 15 SafetyDataSheet IG 01 Argon...
Page 228: ...Oxeo PR LCP 10 2022 en 222...
Page 229: ...Oxeo PR LCP 10 2022 en 223 16 SafetyDataSheet IG 100 Nitrogen...
Page 236: ...Oxeo PR LCP 10 2022 en 230...
Page 237: ......