A successful commissioning test is the prerequisite and final assembly procedure for a system
transfer to the operator. Therefore, not only the function test must be completed flawlessly,
but the entire system must also be in a commissionable state.
Before commissioning, the acceptance checklist must be used to determine that the entire
system complies with the owed capacities and the commissioning test can be performed.
Sequence of commissioning
1. Consider fire detection lines of fire detection technology and check whether no fire alarms
arise.
2. Make sure that no undesired system states are present.
3. Consider activation lines of electrical extinguishing control technology and check whether
no control signals arise.
4. Make sure that no undesired system states are present.
5. Commission control and pilot cylinder of the extinguishing system.
6. Make sure that no undesired system states are present.
7. Commission subordinate elements of the pneumatic system control if not in operation.
7.1 Preparations
Personnel:
•
Authorized Distributor
Protective equipment:
•
Safety goggles
•
Safety gloves
•
Safety footwear
Material:
•
Test device for pneumatic actuation (any air supply under 144 psi)
WARNING Risk of injury due to faulty release
Faulty release of the system may cause serious injuries or death and significant property damage.
• Carry out all functional tests during commissioning, servicing and repair work so that the system
is not activated.
• Before starting work, always carry out the following tasks.
Summary of Contents for Oxeo
Page 1: ...Installation and Maintenance Manual Oxeo Inert Gas Extinguishing System...
Page 10: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 4...
Page 32: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 26...
Page 42: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 36...
Page 134: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 128...
Page 148: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 142...
Page 156: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 150...
Page 176: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 170...
Page 206: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 200...
Page 220: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 214...
Page 221: ...Oxeo PR LCP 10 2022 en 215 15 SafetyDataSheet IG 01 Argon...
Page 228: ...Oxeo PR LCP 10 2022 en 222...
Page 229: ...Oxeo PR LCP 10 2022 en 223 16 SafetyDataSheet IG 100 Nitrogen...
Page 236: ...Oxeo PR LCP 10 2022 en 230...
Page 237: ......